Assembly line balancer5177688Abstract Assembly line balancer groups tasks of multi-sided, mixed model assembly lines on the basis of per side and per model constraints. Resulting compound tasks involve less computational time and power in balancing the line. Claims What is claimed is: Description BACKGROUND OF THE INVENTION
______________________________________
CUMULATIVE
STATION TASK TIME IDLE TIME
______________________________________
W1 . . . T2,T6,T1,T5,T3
117 3
W2 . . . T8,T11
110 1
W3 . . . T9,T1,T7,T12
62 62
______________________________________
The balance delay for this assembly line can now be derived by taking the difference between the total assembly line time (360 seconds) and the sum of the cumulative task time (289 seconds) and dividing the result by the total assembly line time. The resulting balance delay is nineteen percent, which means that the operators on this line will be non-productive or idle nineteen percent of the time. This balance delay is caused by the uneven distribution of the task times among the workstations. An ideal case of zero balance delay can be achieved when all of the cumulative task times of the workstations are equal. In this ideal situation, the cycle time could be set to this cumulative task time and no idle time would result. Such ideal conditions can seldom be achieved in real solutions, however. It may be possible to improve assembly line performance by selecting a different cycle time. It is useful to perform the balance technique again to demonstrate how cycle time can impact balance delay as well as the number of workstations required. For instance, if the example assembly line were re-balanced with a required maximum cycle time of eighty seconds, the results would be as follows. W1 could only have tasks T2, T6, and T1 assigned to it, for a cumulative task time of seventy-four seconds. W2 would have T5 and T8 assigned to it resulting in a cumulative task time of sixty-eight seconds. Note that T7 can also be assigned to W2 because this will not violate the cycle time constraint, and also because the immediate predecessors (T6 and T5) have already been assigned. W3 will be assigned T3, and T4, but T11 will not be assigned because of the cycle time constraint. However, T9 and T12 can be assigned without violating either the cycle time or the precedence constraints. Lastly W4 will have T11 and T1 assigned to it. The results are shown below.
______________________________________
CUMULATIVE
STATION TASK TIME IDLE TIME
______________________________________
W1 . . . T2,T6,T1
74 6
W2 . . . T5,T7,T8
80 0
W3 . . . T3,T4,T9,T12
75 15
W4 . . . T11,T1
60 20
______________________________________
The resulting balance delay for the line is now less then ten percent. Note however, that four workstations are now required instead of the previous three. Idle time is decreased, and with a lower cycle time, the overall production rate can be increased. The tradeoff is that now four operators must be hired, or four workstations must be maintained. The benefits/costs of these factors must be considered and evaluated by the line designers. The purpose of assembly line balancing is to provide a method for deriving the most efficient division of tasks for the criteria. Although useful for demonstration and explanation, the above example is obviously trivial. Real world assembly lines may entail hundreds of tasks divided amongst scores of workstations. Perhaps more importantly, real world constraints upon machinery, personnel, physical space, etc. can seriously affect the complexity of the balancing process. In an automotive assembly line, a spray painting operation would provide a good example of such real-world constraints. Often the painting operation must be performed away from other tasks to avoid interference, or overspray marring other components. Therefore, although it may be advantageous from a balancing perspective to combine the painting task with several other tasks in a single workstation, this may not be practical. Therefore, there must be a way to constrain the line balancer to keep this task separate, regardless of how it impacts balance delay. Other constraints must be taken into account. For instance, modern assembly lines are designed for flexibility. It is not uncommon for two or several different models of a product to be produced simultaneously on a given line. An example would be an automobile assembly line which produces four door as well as two door models of a given automobile. Even a given model, such as the two door will have several options which will vary from automobile to automobile. Typically, several different models will be on a given line at any one time. To balance the line for only one model will result in unacceptable balance delays and inefficiency. To re-balance the line each time a different model is started would be completely impractical. Therefore, an assembly line balancing technique must be able to account for multiple models on a single assembly line. Another real world requirement that must be met is that of a multisided product. Continuing with the automobile example, it is clear that the steps or tasks required to complete the driver's side of an automobile are different from the tasks required for the passenger's side. The steering wheel, brake and accelerator pedals, and other tasks are side specific. Again, balancing for only a one-sided product will result in gross inefficiency in a real world line. Therefore, in order to meet the demands of the application, an assembly line balancing technique must 1) provide a near-optimum solution 2) do so without excessive computation time and 3) have the capacity to adjust the outcome for real-world constraints such as the ones listed above. Known practical assembly line balance techniques have problems, including: the inability to handle multi-sided, mixed model product assembly lines, and non-user friendly input formats. SUMMARY OF THE INVENTION The present invention provides a near-optimal assembly line balance for a mixed model, multi-sided product. Line information is input in a user-friendly format, and output data can be graphically depicted in a variety of user-chosen format. BRIEF DESCRIPTION OF THE DRAWINGS FIGS. 1a-b illustrate the data for and precedence diagram of a simple assembly line. FIGS. 2A and 2B illustrate a typical line balance input format. FIGS. 3a-e illustrate the progressive steps of modelling an assembly line for balancing. FIGS. 4a-g illustrate the progressive steps of assigning tasks to work-stations. FIGS. 5-6 illustrate the output format for a line balance. FIG. 7 illustrates a system for balancing the assignment of a plurality of tasks for a plurality of models of a product according to the present invention. DESCRIPTION OF THE PREFERRED EMBODIMENTS The first preferred embodiment method balances multi-sided, mixed model assembly lines with several types of constraints imposed upon the grouping of tasks among the workstations. In a multi-sided assembly line the product can have tasks performed upon it from one of many sides (front and back, left and right, top and bottom, etc.). Some tasks may be common to both sides, but this is not required. A mixed model assembly line may have several different models of a product being assembled on the line concurrently. The goal of assembly line balancing in such a case is to balance the line efficiently regardless of the model mix, i.e. regardless of the relative numbers of each model type being assembled. The types of constraints imposed upon the grouping of tasks is considered in detail below. A precedence diagram defines only one type of constraint, that is chronological precedence of tasks. Many other types of constraints must be defined, however, in order to accurately model the assembly line for balancing. For instance, physical placement of certain machines may require that tasks involving those machines be performed together. Likewise, concerns for operator safety may prescribe that certain tasks not be performed at the same workstation, for instance separating operator assisted tasks from tasks which present a great hazard for line workers. Some tasks are of such a nature that it is most efficient to allow no other tasks at the same workstation. A spray painting step was previously given as an example of such a task. Further, an adaptable, flexible modern assembly line on which tasks can proceed on several sides of the product in unison, and on which several models of the product can be produced simultaneously, requires that even further restraints be taken into account. For a one-sided product on a single model assembly line, four types of constraints apply: ALONE specifies a task which cannot be combined with any other task at a station. If a task is considered particularly dangerous, or critical, it may be constrained as an ALONE task. On the other hand, a task which must be performed with a specified other task or tasks (at the same workstation) has a WITH constraint associated to it and with those tasks with which it must be grouped. Some tasks are not required to be performed ALONE, but nonetheless have constraints imposed on them such that they will not be performed with specified other tasks. This type of constraint is termed NOT WITH. As an example, a line designer might want to assure that a heavy vibration producing task is constrained to be NOT WITH a delicate precision requiring task. Note that the ALONE constraint is an extreme case in which one task has been constrained NOT WITH all other tasks on the line. A more complex assembly line involves a multi-sided product in which tasks are grouped not only by the constraints described above, but also in relation to what side of the product they are to be performed. For instance, if it is desired that a certain first task is performed on the left side of the product before a certain second task is performed on the right side of the product, a SIDE BEFORE constraint is attached to the left side task. This task will constrain the line such that the right side task cannot be performed until left side task has been performed. Note that this constraint does not specify whether the two tasks need be performed at different stations, merely that they be performed in the prescribed order. In essence this is a precedence constraint between tasks on different sides of the product. However, if SIDE BEFORE and SIDE NOT WITH constraints are combined, the tasks will be performed at a previous workstation. A SIDE ONLY constraint specifies that no tasks from other sides can be performed at the same workstation as the task with the SIDE ONLY constraint. This case is less constrained then the ALONE task which can have no other tasks occur at the same workstation. In the SIDE ONLY case, tasks can be performed on the same side as the constrained task. Only tasks on other sides of the product are precluded. Such a constraint may be prudent when a task involves drilling completely through the product; although the task may not be dangerous to other workers on the same side as the driller, it could be hazardous to workers on the opposite side. SIDE WITH constrains the line such that tasks from different sides must be performed at the same workstation. For instance, it may be most efficient to have the tires of both sides of an automobile mounted at the same workstation. Conversely, SIDE NOT WITH constrains that certain tasks from different sides cannot be performed at the same workstation. This does not mean that no tasks can be performed at a different side at the workstation. Only those tasks listed in the SIDE NOT WITH constraint are excluded. Further grouping constraints are required when more than one model of a product are run simultaneously on the line. For instance, MODEL WITH specifies that the listed tasks must be done at the same station for all models. For instance, if one of the tasks for assembly is a fastening operation, it may be most efficient to specify that the fastening tasks for all models be done at the same station. In this way one fastening machine can perform the required operation for all the models without having to be moved to different stations depending on the model currently being assembled. MODEL ONLY specifies that no other model can be performed at the same station as the constrained task. In this way a certain workstation with unique characteristics may be reserved only for the model which requires those characteristics. MODEL NOT WITH, like SIDE NOT WITH, and NOT WITH, specifies certain tasks which cannot be performed at the same workstation as the constrained task. In the case of MODEL NOT WITH, however, tasks are excluded by model. This means tasks from some models will be allowed, while tasks from certain other models will be excluded. The above defined characteristics of task grouping and constraints are resolved into an accurate model of the assembly line as follows: Grouping constraints can be divided into three categories: Task constraints, side constraints, and model constraints. The names suggest the purpose of the constraining function of each group. Task constraints are used to define constraints of the tasks on a single side within a single model group. Side constraints are used to define constraints between tasks of different sides of a single model group. Model constraints are used to define constraints between tasks of different models of the product. The interactions of these various types of constraints can be best illustrated by working through an example of balancing a simple multi-sided, mixed model assembly line. FIG. 2 is an example of the format used in a preferred embodiment to input the various information required about the assembly line tasks and task constraints. The example shown is for a two-sided product run on an assembly line on which there is a mix of two model types. The spreadsheet format allows for ease of inputting the data, as well as a convenient method for displaying and organizing the data. Each row represents one task. The first column contains a task name for each task. The second column contains the task time. The third column specifies any immediate predecessors of the task, i.e. any tasks which have an immediate chronological precedence. The fourth through sixth columns list any of the task constraints. Similarly columns eleven through thirteen list any side constraints for the task, and columns fourteen through fifteen list any model constraints. Columns eight signifies whether the particular is an automated task. Column seven is discussed in detail later. Column nine denotes on which side of the product the task is to be performed, and column ten denotes to which model the task applies. As an example, task T110 (row one) has a task time of five seconds (column two). T110 is to be performed on the right side (column nine) of model B (column ten). The task has no immediate predecessors (column three), and must be grouped WITH T120 (column four), but must be grouped NOT WITH task T130. Further constraints are that T110 must be performed on the right side of the product at the same workstation in which T101 is performed on the left side of the product (column twelve), or SIDE WITH T101. There are also model constraints associated with T110 such that T10 of model A must be performed at the same workstation (column fifteen)--MODEL WITH--and T30 and T3 of model A must not be performed at the same workstation--MODEL NOT WITH. A precedence diagram can be derived from the information provided in columns one, two, and three. The results are shown in FIG. 3(a). Each task is represented by a circle with its task name within the circle. The task time is shown below each task. Precedence constraints are shown by the arrows. For instance, T10 has no predecessors, so it is placed on the extreme left of the diagram. T20 and T30 have T10 as a predecessor, so they are placed to the right of T10, with arrows originating at T10 and terminating at T20 and T30. Lastly T40 has T20 and T30 as predecessors, so it is placed to the right of them and with arrows originating at them and terminating at T40. We are now faced, in FIG. 3(a) with four distinct partially ordered sets, corresponding to the Left side of Model A, the Right side of Model A, the Left side of Model B, and the Right side of Model B. However, the constraints which are imposed between the sides of the product, or between tasks performed on different models of the product are not shown in the diagram. Additionally, although the RPWT heuristic can prioritize the assignment (to workstations) of tasks for each individual side it gives no indication as to how to prioritize tasks between sides or models. In the preferred embodiment, the constraints between tasks on different sides and different models will be modeled into the precedence diagram. Additionally, the assignment of tasks to workstations will be prioritized in light of these constraints. Additionally, the computational requirements for balancing the line will be greatly reduced by combing those tasks which have a WITH, SIDE WITH, or MODEL WITH constraint, into compound tasks and treating these compound tasks as model groups. In this way the number of distinct entities which must be tracked and evaluated during the assembly line balancing process is greatly reduced, leading to faster resolution of the problem, with less computational effort. This is accomplished as per steps A-F as follows: A. The information from column two of FIG. 2 is modeled into the diagram by combining those tasks which are WITH constrained together into a compound task. Theoretically this means the two (or more) tasks are combined into one large task. The tasks are still distinct operations on the line, but for balancing purposes, they will be treated as a single task. For this reason, the compound task will have a task time equal to the sum of the task times of the WITH constrained tasks which are included. The precedence diagrams are re-drawn in FIG. 3(b) with the WITH constrained tasks modeled by combining them in a single symbol. For instance, T110 and T120 are WITH constrained together, as are T10 and T20. This simplifies the precedence diagram by removing the ambiguity as to which task--T120 or T130--should be giving higher priority when assigning the tasks to workstations. There is still ambiguity between tasks T102 and T103, however, as well as T2 and T3, i.e. the sets are only partially ordered. This is resolved by applying the RPWT heuristic to the diagram. The positional weights of the tasks are shown above each task symbol in FIG. 3(b). For instance, T4 with a task time of thirteen seconds has a weight of thirteen. T2's weight is equal to T4's weight plus T2's task time, or nineteen. Similarly, T3's weight is equal to T4's weight plus T3's task time, or twenty-three. T1 has a weight equal to it's own task time plus the times of all the tasks which follow, or thirty-six. Therefore, these tasks prioritized for assignment to workstations in order of their weights would be assigned in the order of T1, T3, T2, T4. A similar analysis is performed on the other sets of tasks. For convenience and ease of visualization, the precedent diagram can be re-drawn with the tasks linearly ordered, i.e. placed from left to right in descending order, and with the WITH tasks drawn as a single compound task, as shown in FIG. 3(c). The precedence arrows have been left out of the draw to show that the tasks are ordered from left to right by their ranked positional weight and not necessarily by precedence. B. SIDE WITH constraints are next modeled into the diagram. In FIG. 3(d) the SIDE WITH constraints which are listed in Column twelve of FIG. 2 are shown by encompassing the component tasks (or task groups) with a bold line. SIDE WITH constraints can be between tasks, compound tasks, or both. C. The SIDE WITH tasks are grouped together into a compound task, much like the WITH tasks were grouped to form a compound task, however, the SIDE WITH group must be treated differently. Tasks which have a WITH constraint are performed serially on the same side of the product at the same workstation. In comparison, SIDE WITH tasks can be performed in parallel because they are performed on different sides of the product. Therefore, the task times do not add up for the SIDE WITH groups. In fact, the task times for the tasks which make up a SIDE WITH group must be kept track of, for reason which will be apparent when the tasks are assigned to the workstations. The purpose behind grouping the SIDE WITH tasks together is so that they will be considered for assignment to the workstations together. Since all the tasks must be grouped together, it follows that the ranked positional weight of these tasks ought to reflect this. For example, in FIG. 3(d) tasks T3 and T30 are SIDE WITH grouped together, per column twelve of FIG. 2. Recall that in FIG. 3(c) T3 had a weight of twenty-three and T30 had a weight of twenty-two. Since by the definition of SIDE WITH grouping, T3 must be assigned to the same workstation as T30, this is the same as saying that all tasks which must be proceeded by T30 must also be proceeded by T3. This is reflected by giving all the tasks within the SIDE WITH group the same weight as that of the task with the greatest weight in the group. Therefore, after the SIDE WITH tasks are grouped together, the RPWT heuristic is run again, however the SIDE WITH groups require special treatment. Beginning the heuristic with the top row in FIG. 3(d) T4 is given a weight of thirteen, as before, T2 is given a weight of nineteen (T4 task time plus T2 task time) and T3 has its task time added to that of T2 to get a weight of twenty-nine. Similarly, on the second row, T40 has a weight of ten and T30 has a weight of twenty-two. As stated above, however, in order to give the tasks within a SIDE WITH group the same priority, we wish to have all tasks within the group have the same weight. To assure most efficient packing, this weight is the maximum weight of a task within the group, which in this example is T3, twenty-nine. Therefore, processing continues in the first row with T3 having a weight of twenty-nine, but additionally processing continues in the second row with T30 also treated as having a weight of twenty-nine (as denoted by the weight of twenty-nine above the SIDE WITH group). The result of this is that the weight of T10/20 is equal to forty (task time of eleven plus new weight of twenty-nine for T30) rather then the thirty-three it was previously. This reflects the added `baggage` that T30 now has associated with it by its grouping with T3. The same holds true for the SIDE WITH group of T101 and T110/120. In this case these tasks are leftmost and so no other tasks are impacted by the grouping. However, it still holds true that the weight for T110/120 will be treated as thirty-six as shown above the SIDE WITH group. D. MODEL WITH constraints are dealt with next. FIG. 3(e) shows the information of column fifteen of FIG. 2 modeled into the diagram. MODEL WITH constraints are symbolized by the bold line encompassing the component tasks (or task groups). In this instance T110 is MODEL WITH constrained with T10. However, since both T110 and T10 are already grouped with other tasks, all of the tasks become grouped together. MODEL WITH groups can include tasks, compound tasks, SIDE WITH groups, or combinations of the above. MODEL WITH groups are unlike WITH or SIDE WITH in that they in fact are not performed either serially or in parallel. In fact, MODEL WITH groups are performed on different models of the product and could never be performed at the same time (to do so would require two separate units of product to be at the workstation at one time). Nonetheless, to account for multi model assembly lines, the line is modeled to account for any task (regardless of which model) which may be required in the assembly process. In order to assure that there will be adequate cycle time at each workstation, regardless of which model is being worked on, the line is balanced as if MODEL tasks are being performed in parallel. Therefore, the weight given to each task in a MODEL WITH group will be equal to the weight of the task with the greatest weight in the model group. This is indicated in FIG. 3(e) by placing the weight above MODEL WITH group. E. As before, the RPWT heuristic must be run again in order to adjust those tasks which precede tasks within the MODEL WITH group which have had their weights increased. This is shown in FIG. 3(e). F. Each task or task group in FIG. 3(e) can be considered as a model group, even if the `group` contains only one task. Hence, T110/120/101/10/20 is one model group and T1 is another model group. This greatly simplifies the assignment process. As originally drawn, the precedence diagram contained sixteen separate tasks which had to be considered. Barring any constraints on the tasks the number of possible combinations would have been (16!) 2.1.times.10.sup.13. In FIG. 3(e) the diagram has been reduced to nine groups, thus reducing the total number of permutations to (9!) 3.6.times.10.sup.5. Naturally, no assembly line is going to have no constraints whatsoever on the tasks, however the example given is in fact a trivial one. Typically, one starts with a precedent diagram with hundreds of tasks which must be assigned to workstations. By grouping those tasks into a logical manner which is dictated by the very constraints of the line, the process is greatly simplified. Additionally, as each task or group in FIG. 3(e) is a model group, the priority of assigning tasks is established, not on a per-side per-model basis, but on a complete interrelated basis. Having simplified the process to a manageable level and prioritized the order in which tasks should be assigned, the next step is to begin to assign the tasks to the workstation. To do so, tasks are assigned in descending order of weight. When assigning tasks to the workstations three criteria must be evaluated each time: 1) Has the task already been assigned to a workstation? 2) Will cycle time be exceeded by assigning the current task to the current workstation? 3) Will any of the constraints be violated by assigning the current task to the current workstation? In the current example the model groups will be considered in the order T110/120/101/10/20, T1, T103, T130/30/3, T102, T2, T140/40, T4, T104. For convenience, these groups will be renamed M1 through M9 respectively. For illustrative purposes a cycle time of twenty seconds is imposed. The process begins with opening a workstation W1, and assigning M1 to it (M1 is then flagged as already assigned) as shown in FIG. 4(a). Note that although the tasks are assigned in a group, the individual task times must be tracked for tasks within the SIDE WITH and MODEL WITH groups. This is because these tasks are running in parallel, and although the tasks to be performed on the left side have reached the cycle time limit, additional tasks may still be added to the right side, until the cycle time has also been reached on that side. Having assigned M1 to W1 the next step is to check columns six, fourteen, and seventeen to see if this is an ALONE or SIDE ONLY, or MODEL ONLY task. If so, no other task, or no other task of a different side, or no other task of a different model, respectively, could be assigned to the same workstation. In this case, no task contained within M1 has any such constraint, so we are free to assign additional tasks to W1. The next group to be considered is M2. This group also has no ALONE or ONLY constraints. Additionally columns five, thirteen, and sixteen must be checked to see if adding M2 to W1 would violate any NOT WITH, SIDE NOT WITH, or MODEL NOT WITH constraints. In this case it would not. Lastly we must check to see if adding M2 to W1 would exceed the cycle time. M2 contains only T1 which is from the left side of model A. The cumulative task time for the left side of model A in W1 to this point is zero because no other left side model A tasks have yet been assigned to W1. Therefore M2 can also be assigned to W1 as shown in FIG. 4(b). M2 is flagged as having been assigned and processing continues. The same procedure is followed for M3. M3 contains only T103, which has no ALONE, or ONLY constraints, however, note in column five T103 has a NOT WITH constraint with T101. Therefore, although it would not exceed cycle time by doing so, M3 cannot be assigned to W1. To do so would violate the NOT WITH constraint. Therefore, M3 is set aside for later processing and M4 is next evaluated. M4 contains only T102 which only has the constraint (column 16) of a MODEL NOT WITH T3 and T30. Neither of these two tasks has yet been assigned to W1, so this will not preclude assigning M3. Checking the cumulative task time for the left side of model B we see that adding T102 results in a cumulative time of eighteen seconds, which is less than the cycle time. Therefore, M4 can be assigned to W1 and flagged as already assigned as shown in FIG. 4(c). The next group to be evaluated for assignment is M5 which contains T130, T30, and T3. This group has many constraints which preclude it from assignment to M1, the first of which is the NOT WITH constraint between T130 and T110 (column 5). Since T110 is already assigned to W1, M5 is passed and processing continues with M6. Note that by having the tasks grouped this way, all the tasks within M5 can be evaluated as invalid for W1 on the basis of evaluating only one constraint of T130. This strategy greatly decreases the computational time for solving the line balance. In large complex lines the decrease in computational time becomes very significant. Proceeding to M6 which contains T2 only, the only constraints are NOT WITH T3, MODEL NOT WITH T30, neither of which have been assigned to W1. The cumulative task time for the left side of model A will be thirteen once T2 is added to W1, which does not exceed the cycle time. Therefore, M6 is assigned to W1, and flagged as already assigned as shown in FIG. 4(d). M7 which contains T140 and T40 has no constraints which prevent its assignment to W1, however doing so would exceed the cycle time for both the right side of model A and of model B. Therefore, M8 is considered next, but again adding T104 to W1 would exceed the cycle time. The same is true for T4 of model M9. Therefore, W1 is closed to further assignments and the process is continued with a new workstation W2. The model groups are considered for assignment to W2 in order of their ranked positional weight, just as done previously. M3 containing T103 is considered first because it is the group with the greatest weight which has not been flagged as already assigned. M3 is assigned to W2 and flagged as already assigned as shown in FIG. 4(e). Tasks T130, T30, and T3 have NOT constraints which prevent them from being assigned to W2 along with T103, so M5 is next assigned to W2 and flagged as already assigned as shown in FIG. 4(f). M7 is next considered, but note that adding T140 to W2 would exceed the cycle time. Therefore, M7 is passed and processing continues with M8. The same is true for M8 and M9. Although in both cases, adding the tasks to W2 would violate no constraints, the cycle time would be exceeded by doing so. Therefore, W2 is closed with only T130, T103, T30, and T3 assigned to it. W3 is opened and T140 and T40 are assigned to it first, followed by T104 and T4. The complete assignment of tasks to workstations is shown in FIG. 4(g). By grouping the tasks into model groups based on their WITH constraints the number of objects that needed to be considered was reduced from sixteen tasks to nine model groups. Further, rather than having to evaluate each tasks within a model group, it was possible to reject all the tasks within a model group based on the incompatibility of one task within the group to some task already assigned to the workstation. In a typical modern assembly line this type of simplification of the balancing problem can make the difference between a practical assembly line balancer and one which is theoretically possible but completely impractical for real-world applications. More importantly, by taking the various SIDE and MODEL constraints into account at the outset, the preferred embodiment allows the line modeler take advantage of the capability to perform tasks on different sides of the product in parallel. Furthermore, this approach allows for any mix of models which product demand may dictate. A second preferred embodiment maximizes balance efficiency by performing a step-wise optimization technique to determine whether a lower cycle time can be used then the user-defined cycle time without requiring any more workstations then were required by the user-defined cycle time. Alternatively, the step-wise optimization technique determines whether fewer workstations can be used then the user-defined number of workstations without requiring any greater cycle time then was required by the user defined workstations. This concept will be explained in detail, infra. Additionally a second preferred embodiment maximizes line efficiency by creating parallel workstations in order to assign more tasks to a given workstation without violating the maximum cycle time constraint. The second preferred embodiment involves the details disclosed in the first preferred embodiment, and the following features: The second preferred embodiment can balance a line two ways. Firstly, the user can input a maximum cycle time limit in which case the line balancer derives the minimum number of workstations which can perform all the tasks required by the line (for the given cycle time). Secondly, the user can input a maximum number of workstations in which case the balancer derives the minimum cycle time for which the given number of workstations can perform all the required tasks. In either case one criterion determinative of the resulting efficiency of the line is the user-defined input. Greater efficiency may result, however, by using the resulting line balance as a starting point for a bisectional optimization technique, rather than as a final result. To demonstrate, consider the case where the user defines a maximum cycle time (U). The outcome of the line balancer results in a minimum number of workstations (X) which can perform all the tasks required by the line. Therefore, the resulting line contains X workstations, at each of which the product is available to have tasks performed for U seconds (or minutes, or whatever unit of time the user defines). As shown previously, some or perhaps all of the workstations will require less then U seconds, which results in balance delay. In fact, it is very rare for a line balance to result in every workstation using the full U seconds with no idle time. The assembly line is efficiently balanced as regards the input cycle time (U); however, there may be a cycle time (O) which is less then U, but which requires no more then X workstations to balance the line. If this is the case O results in greater production rate then U (production rate is inversely proportional to cycle time) and additionally, O generally results in less balance delay. To determine if a more efficient cycle time O exists, the line balancer proceeds as follows: For a given assembly line, the nominal cycle time (N) is defined as the sum of all the tasks times divided by the number of workstations (in the current case X). This nominal cycle time will be a best case time which would result if tasks could be assigned to workstations with no precedence or grouping constraints, which for all intents and purposes is not possible to achieve. However the nominal cycle time is useful as defining a minimum cycle time which is approachable. The maximum approachable limit is U, the user-defined cycle time, naturally, since this was defined by the user as a maximum. The goal of the optimization process is to determine what minimum cycle time in this range results in a line balance which requires no more then X workstations. This is accomplished by an iterative process in which a cycle time is chosen which is midway in the interval between the previous cycle time and the appropriate limit. As an example, assume an assembly line balance, in which the user defined cycle time is twenty seconds, results in a ten workstation line. The balancer first determines the nominal cycle time (derived by dividing the sum of all the tasks by ten workstations) which in this case is determined as six. The midpoint of the interval between these two limits is fourteen seconds. The balancer then re-runs the line with a fourteen second cycle time. Two possible outcomes result from re-running the line at fourteen seconds: 1) The resulting balance requires more than X workstations. 2) The resulting balance requires X workstations. In the first instance, the balancer attempts to find a cycle time between fourteen and twenty seconds which will result in a balance which requires X stations. Again the midpoint of the interval between the limits is chosen, in this case seventeen. Again, the two above enumerated outcomes are possible. If seventeen seconds results in more than X workstations, the balancer re-runs the line with a cycle time midway between twenty and seventeen seconds (in this case rounded off to eighteen seconds). If however, the seventeen second balance results in X workstations, a more efficient line results. It is still possible, however that an even more desirable cycle time is possible. Therefore, in this case the balancer re-runs the line with a cycle time midway between seventeen and fourteen seconds (in this case rounded off to fifteen). With each step of the iterative process, the cycle time selected is midway between the previously selected cycle time and either the upper or lower limit (depending on whether the previously selected cycle time resulted in X or more than X workstations). In other words, depending on whether the cycle time results in more than X workstations, the balancer adjusts the cycle time either up or down until a minimum cycle time which requires only X workstations is determined. This is efficiently done by choosing the cycle time in half interval increments in order to narrow down to a result as quickly as possible. The preceding explanation also applies to the second possible outcome whereby the selected cycle time results in X workstations, except in this case, rather than selecting successively larger cycle times, the balancer selects successively smaller cycle times (in half interval increments as described above) until selecting a smaller cycle time would result in more than X workstations. Then the interval between this cycle time and the previously chosen cycle time is incremented until the minimum cycle time which results in no more than X workstations is determined. Therefore, by starting with the number of workstations required by the user-defined cycle time, the line balancer evaluates successive cycle times in half-interval increments until either a minimum cycle time which results in X workstations is found, or a pre-set number of iterative cycles has lapsed--in which case it is improbable that a more efficient cycle time can be found than the one defined by the user. The above discussion applies when the user inputs a maximum number of workstations which can be defined, and the balancer results are in terms of cycle time. In this case the line is re-balanced successively fewer workstations in a similar iterative process to the one described supra until the cycle time is impacted, at which point an optimal number of workstations has been derived. An additional feature of the second preferred embodiment is now discussed, namely relaxing the maximum number of parallel workstations attributes in the knowledge base to display how creating parallel workstations may impact the resulting line balance. This feature allows a user to run various line balance scenarios to analyze how parallel workstations may impact the line performance. Often the resulting decrease in cycle time and corresponding increase in production rates justifies the additional expense of purchasing additional equipment or training new operators. By performing the analysis, the balancer allows the user to evaluate many options which are not apparent from the line balance as originally constrained by the user's input. A workstation W1 is parallel to another workstation W2 when the same tasks are assigned to both. Using two workstations in parallel results in a lower overall cycle time required, and may also result in a decreased balance delay. To illustrate, consider an assembly line in which it is desired to limit the cycle time to a maximum of ten seconds, in order to meet production quotas. Task T10, for example a drilling task, has a task time of twelve seconds. As previously stated, in a conventional assembly line balancer this line could not be balanced because the cycle time had to at least equal the task time of the longest task. In other words, we are trying to perform a twelve second task at a workstation wherein the product is only present for ten seconds. It is possible that a human operator could follow the product outside of his workstation in order to fulfill the last two seconds of the task time, but this would detract from the time available for the next unit, thus causing an eventual log-jam. Additionally for a fixed machine this is impossible. If, however, the drilling task was assigned to two workstations, alternating between them, the goal can be achieved. In other words, the first unit of product is drilled at W1, and the next unit of product is drilled at W2. Although the task time for each workstation is still twelve seconds, the cumulative task time of the two stations working in parallel is equivalent to six seconds, which is well within the cycle time limit. So in this way, the assembly line can be balanced with task times which exceed the cycle time. To see how running workstations in parallel can impact the cycle time, and balance delay consider the following example of a simple assembly line with a cycle time of twenty seconds and task times as follows: T1 . . . 20 seconds T2 . . . 15 seconds T3 . . . 15 seconds T4 . . . 10 seconds. The only constraint on this line is that T1 is NOT WITH T2 and the precedence constraints are per the numerical order (T1 precedes T2 which precedes T3 which precedes T4). Since grouping any tasks together at a workstation results in a cumulative task time which exceeds the cycle time, a balance of this line results in four serial workstations, each of which has one task assigned to it. The balance delay for this resulting assembly line is twenty-five percent idle time. The line can be re-balanced with much greater efficiency by using the parallel workstation concept. Assigning T2, T3, and T4 to a workstation results in a cumulative task time of forty seconds. However, running two workstations in parallel results in a twenty second throughput, which satisfies the twenty second cycle time. In other words, T1 is assigned to W1 with a cumulative task time of twenty seconds. T2, T3 and T4 are assigned to parallel workstations W2A and W2B with a total cumulative task time of forty seconds. This forty second cumulative task time is divided between the two parallel workstations, resulting in a twenty second equivalent cycle time. In this case the balance delay has been reduced to zero, and the total number of workstations has been reduced to three. It is important to note that the tasks T2, T3, and T4 are not split between the two parallel workstations. All three tasks are done at each workstation, with successive units of product alternating between the two. A complex assembly line can have three, four, or more workstations run in parallel. More than one group of tasks can be run in parallel workstations, which means there may be several different parallel workstations set-ups on a single line. The criteria to judge in determining whether a task should be performed at parallel workstations include the number of operators with the skills to perform the given task, space constraints of the manufacturing floor, machines available for performing the task, and the cost of the above versus the benefit of faster production rates. Whether a task is assigned to parallel workstations during the balancing process is determined by the knowledge base. The maximum number of parallel workstations to which a task can be assigned (based on the above listed criteria as well as others) is an attribute assigned to each task. This maximum number of parallel workstations is input by the line designer in column seven of FIG. 2, and henceforth becomes an attribute of the task just as WITH grouping is an attribute of the task. Often, however, a line designer restricts the number of parallel workstations to which a task can be assigned on the basis of existing equipment or on empirical data for which the value of parallel workstations has not been established. This restriction on the line leads to inefficiencies in the design of the line. An aspect of the second preferred embodiment is that the line can be balanced both with the restrictions defined by the user to derive a balance, and with the restrictions on parallel workstations relaxed. This allows the line designer to compare the efficiency (in terms of balance delay) and the production rates (in term of station time). Often the increased efficiency and production rates more than make up for the increased initial costs of additional equipment or operator training. Compare FIG. 5 and FIG. 6. Both are the resulting output of the same assembly line. In FIG. 5, the user-defined maximum parallel workstations constraints were followed, whereas in FIG. 6, these constraints were relaxed. Analysis of the results requires an explanation of the graphical output format shown in the figures. FIG. 5 is used as an example. The balancer displays the line balance results in a user-friendly and clear format. The user inputs a range of cycle times for which he would care to see the results and the graphs are automatically generated, with the range of stations times displayed as the abscissa of the graph. Each graph includes two ordinates. The left side ordinate contains the number of workstations required for the given cycle time and the data associated with this ordinate is represented by a line graph. The right side ordinate contains the cumulative idle time for the associated cycle time and number of workstations. This data is represented by a bar graph. Therefore, for each point on the abscissa there are two data points: the associated number of workstations and the associated cumulative idle time. In this way all of the essential features of the line balance are readily and clearly displayed. For instance, in FIG. 5, the user selected a range of eight to sixteen seconds cycle times. At eight seconds the line requires fifty-six workstations (derived from the line graph and the left hand ordinate) and the cumulative idle time (or balance delay) is approximately six seconds (derived form the bar graph and the right hand ordinate). When the cycle time is increased to nine seconds, fifty-six workstations are still required, however the cumulative idle time (as would be expected) has increased--to about sixty-two seconds. Increasing the cycle time by one second was not enough to allow any more efficient `packing` of the tasks in the workstations. Therefore the same tasks are performed at each workstation, but there is an additional second to perform them, and hence the cumulative idle time is increased by fifty-six seconds (one second for each workstation). When the cycle time is increased to ten seconds, fewer stations are required to `pack` all tasks. However, again the cumulative idle time increases. It is to be expected that generally the cumulative idle time will increase each time the cycle time increases because the cumulative task time (the sum of the task times of all the tasks) remains constant. Therefore, by increasing the cycle time the time available to perform the same amount of work is increasing thus resulting in increased idle time. The exception to this is when increasing the cycle time results in many fewer workstations required wherein each workstation is `packed` to near capacity. More significant, however, is how the number of workstations is impacted by the increase in cycle time. As more time is available at each workstation, more tasks can be performed at each station, and hence, the total number of stations required decreases, as shown. The graph makes clear that given a choice between eight and nine seconds cycle time, eight seconds should be chosen because there is no corresponding decrease in workstations to offset the increase in idle time. The same is true given a choice between ten and eleven seconds, and between twelve and thirteen seconds. Note, however, the decrease in workstations required between thirteen and fourteen seconds versus the increase in idle time. At thirteen seconds, fifty-one workstations are required, whereas at fourteen seconds only forty-eight are needed. Because these workstations are packed more efficiently, however, the cumulative idle time increases only by about eleven seconds. Clearly, the fourteen second cycle time would be advantageous over the thirteen second cycle time, providing this would not violate some production rate quota. Odds are that the savings in line cost would make up for the slightly lowered production rate. The most significant data point in the graph of FIG. 5 is for sixteen seconds cycle time. At sixteen seconds, the cycle time is large enough to allow many tasks to be assigned to the same workstation. Additionally, because of the typical task times the tasks can be very efficiently assigned to the workstations with a sixteen second cycle time. In fact, the cumulative idle time is less at sixteen seconds then any other cycle time above nine seconds (because at sixteen seconds a very few workstations are packed very efficiently). The optimum cycle time for this range therefore is sixteen seconds. However, again, production quotas and production rate requirements may preclude the line designer from running the line at a sixteen second cycle time. Displaying the relevant factors in this format facilitates analysis of the resulting line balances. Having illustrated the graphical output format in FIG. 5, comparison of FIG. 5 with FIG. 6 demonstrates the benefits in line efficiency which can be gained by relaxing the user-defined maximum parallel workstations constraints. Note that the scale of the left hand ordinate (number of workstations) is constant in both figures, however the scale of the right hand ordinate (cumulative idle time) is different between the figures. The range of cumulative idle times is much lower for the graph in FIG. 6. This is because of the increased efficiency which can be obtained in assigning tasks to parallel workstations over a strictly serial format. FIG. 7 illustrates a system for balancing the assignment of a plurality of tasks for a plurality of models of a product, each of which models has a plurality of sides, to a plurality of workstations 200,205 based on precedence and grouping constraints. (It should be realized that although only two workstations are shown, more may be included in such system. Additionally, although PC workstations are shown for example purposes only, as discussed above, various manufacturing operations, inspections, tests, and/or handling operations are performed at workstations along the line in a serial manner, the result of which is the emergence of a final product at the end of the line). Workstations 200,205 address central processor unit 220 via buses 210,215. CPU 220 in turn communicates with computer memory 240 via bus 230. Within computer memory 240 resides algorithm 250, operating system 270, and interface 260. Task parameters and constraints are input and stored within knowledge base 290 via interface bus 280. Algorithm 250 performs an iterative balancing and grouping process and outputs a display to at least one of the workstations 200,205, wherein the output format corresponds to an input format. Examples of such display are seen in FIGS. 5 and 6, discussed above. CPU 220, buses 210,215, 230, memory 240, operating system 270, and interface 260 are known in the art and as such will not be further discussed herein. Recall from the above discussion that running workstations in parallel allows groups of tasks which would have otherwise exceeded the cycle time to be assigned to the same workstation. In this way a group of tasks that previously may have required three serial workstations can all be assigned together and run on two workstations running in parallel. Therefore, for any given cycle time the number of overall workstations required will usually be less, as is shown to be the case when comparing FIG. 5 and FIG. 6. Recall, however, that parallel workstations require additional trained operators, possible additional tools and machinery, and additional floor space. Therefore, an experienced and knowledgeable line designer must still make decisions regarding the costs and benefits for various parallel and serial workstations schemes. By providing a clear and readily obtained graphical format which shows the analysis of both user-defined parallel constraints and no parallel constrains, the line balancer allows a line designer to analyze many options that might have otherwise been too tedious, expensive, or time-consuming to consider.
|